Steps for Deploying the Big Bags USA Systems

Big Bags USA rapidly deployed flood barrier systems, provides lightning fast protection at a fraction of the cost. The deployment of our ground conforming systems is both simple and easy.  No other system on the market is as versatile and user-friendly as Big Bags USA.  Below are step-by-step instructions on how to deploy our Big Bags USA flood barriers effectively!


STEP 1: UNPACK SYSTEMS


Your Big Bags USA flood barriers will arrive on pallets of seven systems each. Cut away and remove plastic wrapping. When cutting, be careful to NOT cut the Big Bags USA flood barriers. Every 50 lbs. system is easily removed from the pallet with one or two men. DRIPS, LLC recommends always using safe lifting practices when handling Big Bags USA or any other equipment.

STEP 2: DEPLOYMENT OF SYSTEMS


Place Big Bags USA flood barrier systems in desired location before expanding the system. To expand the system, two workers grasp each end of the system firmly and walk away from each other. Insure all supporting u-frames are in a straight up right position and are evenly spaced from each other. Once the Big Bags USA flood barrier is expanded, the system will stand freely. There is no need for additional support. Repeat the process for the remaining systems.

Try this: Using one ground crew to attach systems while two other ground crews expand Big Bags USA systems will enable continual deployment for a fast response time.

STEP 3: ATTACHING THE SYSTEMS


Big Bags USA flood barriers are attached using seven 3/4 inch screws and a cordless screw gun. To attach the systems, position the flood barrier so that the systems u-frames are evenly touching each other. Place one crew in the center of the cross bar of the u-frame. This helps hold the position of the barriers during the rest of the attachment. Place the remaining screws, three on each side of the vertical bars. Screws must be placed a minimum of 6" from the ground and in the top corners. Continue this process for the remaining systems.

STEP 4: FILLING THE SYSTEMS


When filling the systems, heavy equipment is the recommended method for deploying Big Bags USA effectively and efficiently. For best results, fill the systems directly in the center then from one end to the other. Dump sand in slowly to prevent bulge and spillage. The ground crew should always be a safe distance from heavy equipment. Ground crews can further provide even distribution of filler material.

STEP 5: STRIKING OFF/LEVELING FILL MATERIAL AND SEALING SYSTEMS


Two crew members can easily level fill material using standard hand equipment. The recommended method is to skim with boards. Once fill material is leveled fold over and tie plastic casing (if system is equipped with optional closed top). Be sure to toughly tuck all ends in to the Big Bags USA barrier system to fully envelop the filler material.

For all your flood preparation needs, Big Bags USA has you covered no matter where you are in the United States. Whether you're in need of emergency flood protection or need a temporary barrier for construction projects, Big Bags USA is your solution. No other system on the market is as versatile and user friendly. Call Big Bags USA today at 800-337-0537!  

If you have an immediate need for our systems, or have any questions for us, please Call us Toll Free at 1-800-337-0537 or visit www.BigBagsUSA.com.


D.R.I.P.S.
Disaster Relief & Innovative
Protection Systems, LLC
(573) 480-6699

Let's Connect!

ALWAYS READY TO HELP LOCAL, STATE, & FEDERAL AGENCIES ... BE PREPARED!   

Comments

Popular posts from this blog

Ways to Use Big Bags USA® - Part 1

Cofferdam Construction Barriers Made Easy

Common Causes of Dam Failures